Lane Coburn & Associates, LLC

LCA University

Engineering, Explained.

Plain-language lessons from the engineers at Lane Coburn & Associates — the calculations, code requirements, and field judgment behind mission-critical electrical design, taught the way we explain it to owners, contractors, and reviewers.

Kirkland, Washington Electrical engineering & telecommunications consulting Mission-critical facilities & data centers
Portrait of Keith Lane, P.E., President/CEO and Chief Engineer of Lane Coburn & Associates
Meet Your Instructor

Keith Lane, P.E.

RCDD, NTS, RTPM, LC, LEED AP

President/CEO & Chief Engineer, Lane Coburn & Associates, LLC

Electrical engineer and trial-experienced expert witness with hands-on construction experience. Keith leads LCA University and writes with other LCA engineers.

View expert qualifications

Featured article · Underground Ampacity

Cooked in the Ground

Why Underground Feeders Overheat and Fail

Underground feeders can overheat even when the load looks reasonable on paper. See how duct bank geometry and soil dry-out can contribute to premature failure.

By Keith Lane and Scott Coburn

Read the article
Cross-section of a duct bank beneath a data center

Explore the article library

Browse recent articles and previously published magazine work.

The newest LCA articles. Read the latest articles online or open the original PDF.

Open the LCA Engineering Library
Engineers coordinating a cable pull — cover image for “Coordinating Cable Heating and Pulling Studies” Cable Pulling Coordinating Cable Heating and Pulling Studies LCA Engineering Library Coordinate Neher–McGrath cable ampacity and thermal analysis with cable pulling tension, sidewall pressure, conduit fill and staged installation planning. Read article (PDF) Shelton site view — cover image for “Using Animated Models to Explain Electrical Construction” Construction Visualization Using Animated Models to Explain Electrical Construction LCA Engineering Library See how 2D electrical plans become 3D construction animations, from Shelton site views and UPS replacements to local feeder distribution and overhead corridor coordination. Read article (PDF) Underground cable thermal dry-out illustration — cover image for “Investigating Underground Cable Overheating” Underground Ampacity Investigating Underground Cable Overheating LCA Engineering Library Explore soil thermal resistivity, moisture migration and dry-out, operating loads and the evidence needed to investigate underground cable overheating. Read article (PDF) Endurance one-line diagram — cover image for “Evaluating Primary Metering and Customer Owned Transformers” Medium-Voltage Systems Evaluating Primary Metering and Customer Owned Transformers LCA Engineering Library Use an actual Endurance one-line to explore medium-voltage service, revenue metering, customer-owned transformers, protection and utility rate considerations. Read article (PDF) Microgrid one-line detail — cover image for “What a Microgrid Can Do for a Facility” Microgrids What a Microgrid Can Do for a Facility LCA Engineering Library Explore microgrid objectives, battery energy storage, islanded operation, source separation and commissioning through the Endurance microgrid one-line. Read article (PDF) First page of the 2013 Mission Critical article “Mission Critical Facility Design Issues and Legal Ramifications” by Keith Lane and Elizabeth S. Poeschl From the Archive Mission Critical Facility Design Issues and Legal Ramifications Keith Lane and Elizabeth S. Poeschl · Mission Critical, Nov/Dec 2013 Explores Neher–McGrath heating calculations, soil thermal resistivity and compaction, and distinguishes failure investigation from evaluating the original standard of care. Original publication reproduced unchanged. Read archival article (PDF) UPS input equipment — cover image for “When the Arc Flash Model Does Not Match the Installation” Arc Flash When the Arc Flash Model Does Not Match the Installation Keith Lane and Scott Coburn An arc-flash report can look complete while its electrical model describes an earlier version of a facility. A feeder change, replacement UPS or different protective device may leave the model out of step with the installation. Read article (PDF) Engineers coordinating a cable pull — cover image for “A Cable Pull Can Pass Tension and Still Have Installation Problems” Cable Pulling A Cable Pull Can Pass Tension and Still Have Installation Problems Keith Lane and Scott Coburn A passing pulling-tension result answers one question about a cable installation. It does not establish that every bend, conduit section or handling operation is acceptable. Read article (PDF) Cable pull staging route — cover image for “Where to Break a Long Cable Pull” Cable Pulling Where to Break a Long Cable Pull Keith Lane and Scott Coburn When a continuous pull exceeds a force limit, stages may provide a workable alternative. The proposed break also needs a practical place to receive, handle and refeed the cable without damage. Read article (PDF) Shelton facility rendering — cover image for “Replacing a UPS Starts Before the Equipment Arrives” UPS & Critical Power Replacing a UPS Starts Before the Equipment Arrives Keith Lane and Scott Coburn A UPS replacement is an equipment project, a distribution-system change and a construction operation in an operating facility. A model number and footprint do not define all that work. Read article (PDF) Primary protection one-line detail — cover image for “Selective Coordination in Mission Critical Facilities” Selective Coordination Selective Coordination in Mission Critical Facilities Keith Lane and Scott Coburn A fault on one branch should not unnecessarily remove healthy portions of a mission-critical facility from service. Selective coordination evaluates how protective devices work together to limit that interruption. Read article (PDF) Shelton 2D plan — cover image for “What Makes a Construction Set Ready for the Field” Construction Documentation What Makes a Construction Set Ready for the Field Keith Lane and Scott Coburn A construction set should let the team understand the work, locate equipment and identify installation and acceptance requirements. Repeated reviews help only when resulting changes remain coordinated. Read article (PDF) Forensic investigation illustration — cover image for “What Electrical Drawings Can Establish in a Forensic Investigation” Forensic Engineering What Electrical Drawings Can Establish in a Forensic Investigation Keith Lane and Scott Coburn A drawing explains design intent, but does not by itself prove what was installed, how it operated or why it failed. Drawings, permits, photographs, tests and observations each establish something different. Read article (PDF) Ship’s main switchboard room in navy and gold — cover image for “Power at Sea: Why a Ship’s Electrical System Has to Save Itself” Shipboard Power Power at Sea: Why a Ship’s Electrical System Has to Save Itself Keith Lane · Marine & Shipboard Power Systems A ship at sea has no utility to fall back on — its generators, switchboards and cables are the entire power system. Covers grounding to the hull and first-fault operation, plus the five studies — load analysis, short-circuit, coordination, arc-flash, and voltage drop and motor starting — under 46 CFR Subchapter J, ABS, IEEE 45 and SOLAS. Read the article

LCA Laboratories

Explore electrical engineering calculations through interactive examples.

Underground Duct Bank Calculation

What LCA University teaches

Every lesson follows the same arc — the problem we see in the field, what the rules actually say, the key numbers, and how we approach it at LCA.

Cable Pulling & Pulling Tension Neher–McGrath & Underground Ampacity Selective Coordination UPS & Critical Power Fault Current Calculations Duct Bank Heating Lightning Protection Data Center Electrical Design

Prefer to watch? The lessons are on video, too.

LCA's YouTube channel carries animated construction visualizations, project flyovers, and walkthroughs of the same systems the articles teach — the articles and the videos feed each other.

Visit the LCA YouTube channel